Title Construction time and cost control using the IBM Project Management System/360 / by James Donald Bailey.

Published [Rolla, Missouri] : University of Missouri--Rolla, [1968]
LOCATION CALL # STATUS
 MST DEPOSITORY  THESIS T 2130 c.2  NOT CHECKED OUT
 MST DEPOSITORY  THESIS T 2130    NOT CHECKED OUT
Description vii, 156 leaves : illustrations ; 29 cm
Summary "The object of this investigation was to determine the advantages or disadvantages involved in the use of the IBM Project Management system/360 as a time and cost control tool as compared to the methods presently used by construction contractors in the small to medium size range. The methods used by three construction contractors were investigated in order to acquire a sample of methods presently used. It was determined from the investigation that a number of advantages could be obtained which would provide better control of a construction project. It was also decided that a detailed investigation concerning the cost of installing and using the system must be made in order to determine the feasibility of using the system"--Abstract, leaf ii.
Notes Vita.
Typescript.
M.S. University of Missouri--Rolla 1968.
Includes bibliographical references (leaf 155).
Subjects Construction industry -- Costs.
Cost control -- Case studies.
IBM 360 (Computer)
Other Titles MST Thesis. Civil Engineering (M.S., 1968)
Additional Keywords Construction industry Costs.
Cost control.
IBM 360 (Computer)
Genre/Form Case studies.
OCLC/WorldCat Number 5997996
Author Bailey, James Donald, 1944- author.
Title Construction time and cost control using the IBM Project Management System/360 / by James Donald Bailey.
Subjects Construction industry -- Costs.
Cost control -- Case studies.
IBM 360 (Computer)
Additional Keywords Construction industry Costs.
Cost control.
IBM 360 (Computer)
Genre/Form Case studies.
Other Titles MST Thesis. Civil Engineering (M.S., 1968)